Skip to content
Auto Schedule Maker
Menu

DuPont Schedule Generator

The DuPont schedule rotates four crews through 12-hour day and night shifts over 28 days, with 7 days off in a row. Pick your start date to see every crew's shifts, a month or a year at a time. Free, with no signup.

Your rotation

Pattern

DuPont: 4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days, 7 off. 28-day cycle, 4 crews, 12-hour shifts.

Day 1 of the rotation for crew A.

Shift times
Crew names

Calendar

Month
DuPont schedule for September 2026
SuMoTuWeThFrSa
Aug 30, 2026: Day shift: Crew D, Night shift: Crew A
Aug 31, 2026: Day shift: Crew B, Night shift: Crew C
Sep 1, 2026: Day shift: Crew B, Night shift: Crew C
Sep 2, 2026: Day shift: Crew B, Night shift: Crew C
Sep 3, 2026: Day shift: Crew A, Night shift: Crew C
Sep 4, 2026: Day shift: Crew A, Night shift: Crew B
Sep 5, 2026: Day shift: Crew A, Night shift: Crew B
Sep 6, 2026: Day shift: Crew A, Night shift: Crew B
Sep 7, 2026: Day shift: Crew C, Night shift: Crew D
Sep 8, 2026: Day shift: Crew C, Night shift: Crew D
Sep 9, 2026: Day shift: Crew C, Night shift: Crew D
Sep 10, 2026: Day shift: Crew B, Night shift: Crew D
Sep 11, 2026: Day shift: Crew B, Night shift: Crew C
Sep 12, 2026: Day shift: Crew B, Night shift: Crew C
Sep 13, 2026: Day shift: Crew B, Night shift: Crew C
Sep 14, 2026: Day shift: Crew D, Night shift: Crew A
Sep 15, 2026: Day shift: Crew D, Night shift: Crew A
Sep 16, 2026: Day shift: Crew D, Night shift: Crew A
Sep 17, 2026: Day shift: Crew C, Night shift: Crew A
Sep 18, 2026: Day shift: Crew C, Night shift: Crew D
Sep 19, 2026: Day shift: Crew C, Night shift: Crew D
Sep 20, 2026: Day shift: Crew C, Night shift: Crew D
Sep 21, 2026: Day shift: Crew A, Night shift: Crew B
Sep 22, 2026: Day shift: Crew A, Night shift: Crew B
Sep 23, 2026: Day shift: Crew A, Night shift: Crew B
Sep 24, 2026: Day shift: Crew D, Night shift: Crew B
Sep 25, 2026: Day shift: Crew D, Night shift: Crew A
Sep 26, 2026: Day shift: Crew D, Night shift: Crew A
Sep 27, 2026: Day shift: Crew D, Night shift: Crew A
Sep 28, 2026: Day shift: Crew B, Night shift: Crew C
Sep 29, 2026: Day shift: Crew B, Night shift: Crew C
Sep 30, 2026: Day shift: Crew B, Night shift: Crew C
Oct 1, 2026: Day shift: Crew A, Night shift: Crew C
Oct 2, 2026: Day shift: Crew A, Night shift: Crew B
Oct 3, 2026: Day shift: Crew A, Night shift: Crew B
  • Crew A
  • Crew B
  • Crew C
  • Crew D
  • Day Night

Hours and pay calculator

For Crew A, with the shift times above.

Average per week
42 hrs
Week to week
12–55 hrs

Estimate only. Overtime here is 1.5× for hours over 40 in a Sunday-to-Saturday workweek, and a shift that runs into a new workweek counts in each week for the hours worked there. Rules vary (for example, FLSA section 7(k) for police and fire), and so do pay periods and shift differentials. Not legal or payroll advice.

What is the DuPont schedule?

The DuPont schedule is a 12-hour rotating shift schedule that keeps four crews covering a job 24 hours a day, 7 days a week. Each crew works a 28-day cycle: 4 nights, 3 off, 3 days, 1 off, 3 nights, 3 off, 4 days, then 7 days off in a row.

The four crews run that same cycle one week apart. On any date, one crew works the day shift (7 AM to 7 PM in the generator above), one crew works the night shift (7 PM to 7 AM) and the other two are off.

Over one cycle, each person works 14 twelve-hour shifts, or 168 hours. That’s an average of 42 hours a week, with half of all days off. You’ll also see it called the DuPont 12-hour rotating plan or simply the DuPont rotation. Scheduling guides say it was developed at the DuPont chemical company in the 1950s, though we haven’t found a primary source that confirms it.

Want crews on steady days or steady nights instead? Compare it with the Pitman schedule, or see every rotating shift schedule side by side.

DuPont is a trademark of its owner. We use the name only because it’s what this shift pattern is called. Auto Schedule Maker isn’t affiliated with or endorsed by the company.

The DuPont 28-day cycle, day by day

Here is one crew’s full cycle, starting on a Monday. Read it one row at a time: each row is a week, and the numbers are the days of the cycle.

DuPont schedule: one crew's 28-day cycle
Week of the cycleMonTueWedThuFriSatSunHours
Week 1Day 1: NightDay 2: NightDay 3: NightDay 4: NightDay 5: OffDay 6: OffDay 7: Off48
Week 2Day 8: DayDay 9: DayDay 10: DayDay 11: OffDay 12: NightDay 13: NightDay 14: Night72
Week 3Day 15: OffDay 16: OffDay 17: OffDay 18: DayDay 19: DayDay 20: DayDay 21: Day48
Week 4Day 22: OffDay 23: OffDay 24: OffDay 25: OffDay 26: OffDay 27: OffDay 28: Off0

Hours count each shift in the week it starts. Day shifts 7 AM–7 PM, night shifts 7 PM–7 AM.

  • Week 1 opens with the longest night run: 4 nights, Monday to Thursday, then Friday to Sunday off to recover.
  • Week 2 is the busy one. You work 3 day shifts, get Thursday off, then switch to 3 nights over the weekend. That’s 6 shifts in 7 days.
  • Week 3 starts with 3 days off, then 4 day shifts from Thursday to Sunday.
  • Week 4 is the famous 7 days off. Then the cycle starts again with nights.

The other crews follow the same rows, each one week behind the last. When crew A is in week 1, crew B is in week 4, crew C in week 3 and crew D in week 2, so exactly one crew is on days and one on nights every day. Use “Show” in the generator to follow a single crew.

The 7 days off

The block of 7 days off is the main reason people ask for the DuPont schedule. Every crew gets one every 28 days, so about 13 times a year, without using any vacation time.

In practice the break is longer than it sounds. Your last day shift ends at 7 PM on the Sunday that closes week 3, and your next shift is a night shift that starts at 7 PM on the Monday after week 4. That’s 8 calendar days, or 192 hours, between shifts.

The break also stretches well with a little paid leave. The 4 day shifts in week 3 sit between a 3-day break and the 7-day break. Take those 4 shifts off (48 hours of leave) and you’re off from Monday morning, after your last night, until Monday evening two weeks later: more than 14 days in a row.

The rest of the cycle’s time off is shorter: two 3-day breaks and one single day. Keep in mind that the first “day off” after a night run starts at 7 AM, after you’ve worked all night, so part of it goes to sleep. Counting every date with no shift starting on it, a crew is off 14 of every 28 days.

Modified and reverse DuPont schedules

Reverse DuPont

The reverse DuPont schedule is the same 28-day cycle, started with day shifts instead of nights: 4 days, 3 off, 3 nights, 1 off, 3 days, 3 off, 4 nights, then 7 off. Hours, crews and days off are unchanged.

The difference is where the long break lands. In the reverse version it comes straight after 4 nights, so the break is exactly 7 days (168 hours) from 7 AM to 7 AM, and the first of those days goes to catching up on sleep. The standard version ends its run with day shifts, which gives you the 192-hour break described above. To see it, tick Start with day shifts (reverse DuPont) in the generator.

Modified DuPont

“Modified DuPont” doesn’t name one fixed rotation. It’s used for local changes to the standard plan, and the ones we found in scheduling guides include:

  • Removing the single day off between the 3 days and the 3 nights in week 2.
  • Adding 8-hour shifts for training, or extra Thursday shifts.
  • Adding a fifth crew, which cuts each person’s hours and adds relief for sick days and vacations.

Each of these changes hours or staffing, so the generator doesn’t draw them. It draws the standard and reverse versions exactly.

Some employers also move the cycle’s start day so the 7-day break ends on a chosen weekday. That’s the same rotation with a different start date, which you can set above.

DuPont schedule hours and pay

A DuPont crew averages 42 hours a week, but almost no single week is 42 hours. Counted by the day each shift starts, the four weeks are 48, 72, 48 and 0 hours, as in the cycle table above.

Payroll doesn’t count that way. In the US, overtime is usually worked out per workweek, and a night shift that starts on the last evening of a workweek puts its after-midnight hours into the next one. With Sunday-to-Saturday workweeks and the cycle starting on a Monday, the weeks come out like this:

DuPont schedule hours per workweek, one crew
WorkweekHoursOvertimePay at $25/hr
Week 1488$1,300.00
Week 25313$1,487.50
Week 35515$1,562.50
Week 4120$300.00
Average429$1,162.50

Workweeks run Sunday to Saturday. Overtime is hours over 40 in a workweek, paid at 1.5 times the rate.

The uneven weeks are why the DuPont schedule pays more than its average suggests. A steady 42-hour week would have 2 overtime hours. Here overtime averages 9 hours a week, which at $25 an hour is about $1,162 a week instead of $1,075. With Monday-to-Sunday workweeks the split becomes 48, 65, 55 and 0 hours, or 12 overtime hours a week on average. The total is the same; only the workweek boundary moves.

Enter your own hourly rate in the pay calculator above to see your weekly and biweekly estimate.

How we calculated this

We count each hour in the workweek it’s worked, splitting a night shift at midnight when it crosses into a new workweek. Pay is the hourly rate for the first 40 hours of each workweek and 1.5 times the rate after that, with 12 paid hours per shift and no unpaid breaks. Averages cover one full 28-day cycle. Changing the cycle start date or the first day of the workweek moves hours between weeks, so your own split may differ.

This is an estimate only, not legal or payroll advice. Real pay depends on your employer’s workweek, pay period, shift differentials and any union contract, and other overtime rules, such as FLSA section 7(k) for some public safety employers, may apply.

Pros and cons of the DuPont schedule, including health

Pros

  • A week off every month. The 7-day break comes every 28 days, with 8 full days between shifts.
  • Half your days are free. You work 14 shifts per 28 days.
  • Equal for everyone. All four crews work the same cycle, so nights, weekends and the long break are shared evenly.
  • Easy to plan ahead. The cycle is exactly four weeks, so it repeats on the same weekdays all year.
  • Two handovers a day. Twelve-hour shifts mean two shift changes instead of three on an 8-hour plan.

Cons

  • A heavy second week. Six 12-hour shifts in 7 days, including a switch from days to nights.
  • Frequent changes between days and nights. Each crew changes shift type four times per cycle. Going from days to nights has only one day off in between, so you have to move your sleep fast.
  • Weekend work. With a Monday start, each crew works 2 full weekends out of every 4.
  • Hard to cover absences. Filling a sick call usually means 12 hours of overtime for someone.
  • Uneven paychecks. Workweek hours swing from 12 or fewer in the break week to more than 50.

Health

NIOSH, the federal agency that researches workplace health and safety, says shift work and long hours increase health and safety risks by disturbing sleep and the body’s daily rhythm, and by cutting into recovery and family time. Its guidance for rotating schedules includes keeping consecutive night shifts to a minimum, and it notes that shorter shifts are better tolerated at night than 12-hour ones.

The DuPont schedule’s longest night run is 4 shifts, and each 4-shift run is followed by at least 3 days off. The weak spot is week 2, where the change from days to nights comes after a single day off. Plan your sleep around that switch, and if you have a health condition affected by sleep, talk to your doctor before starting night work.

Frequently Asked Questions

How many hours a week do you work on a DuPont schedule?

42 hours a week on average: 14 twelve-hour shifts, or 168 hours, in every 28 days. The weeks themselves are uneven, from a cycle week with no shifts at all to one with six, so most paychecks include some overtime. The table in the hours and pay section shows the exact split.

Do you really get 7 days off in a row on the DuPont schedule?

Yes. Once every 28 days, each crew has 7 full days with no shift, and because the break sits between an evening shift end and an evening shift start, the time between shifts is 8 days. It's built into the rotation, so it doesn't use vacation time.

What is the difference between DuPont and reverse DuPont?

They are the same cycle with a different starting point. Standard DuPont opens with 4 night shifts; reverse DuPont opens with 4 day shifts, so every day block becomes a night block and the other way around. In the reverse version the 7-day break follows a run of nights instead of a run of days.

How many crews and people does a DuPont schedule need?

Four crews. One works days, one works nights and two are off on any date. Each crew needs as many people as the job needs on one shift, so a plant that needs 5 operators around the clock needs 4 crews of 5, or 20 people, plus any relief staff for vacations and sick days.

How do I make a DuPont schedule calendar?

Use the generator at the top of this page. Set the date your crew starts its first night shift, rename the crews if you like, and check your shift times. Switch to the 12-month view to see the year, then download it as a PDF or image, add one crew's shifts to Google Calendar, Apple Calendar or Outlook with the .ics file, or copy a share link for your team.